MONITORING AND EVALUATION PRACTICES AND PERFORMANCE OF WATER PROJECTS IN ISIOLO COUNTY, KENYA

Biftu Karayu Jillo, Dr. Anne Marie Wairimu Mungai

Abstract


Water projects play a great role to society development and economic spheres as the nation becomes more industrialized and urbanized. Despite the government and NGOs making good efforts to supply water to citizens, it has not been able to cover all areas particularly rural areas.  In Isiolo County, water projects have been plagued with poor performance in terms of budget overruns, poor quality, and late delivery.  The general objective of this study is to determine the effect of monitoring and evaluation practices and the performance of water projects in Isiolo County, Kenya. The specific objectives are to determine the effect of M&E human capacity building, M&E within organizational structure and water projects in Isiolo County. The study used guided by the human capital theory, and contingency theory. The study involved 9 water projects implemented by the county in the financial year 2021/22. The unit of observation was; 9 project supervisors, 9 project managers, 16 county M&E staff, 23 ministry of water officials, and 90 water projects committee members.   Census was used to sample all the targeted respondents. This study used a questionnaire to collect primary data. Statistical Package for Social Sciences (SPSS version 28) was used for analysis. A pilot test was conducted with 10% of the sample, hence 15 project team members was used for piloting. The study used content and construct validity and found that; M&E human capacity building had an AVE of 0.533, M&E within organizational structure had an AVE of 0.550. Reliability was tested using the Cronchba Alpha coefficient and the results showed that; M&E human capacity building had alpha value of 0.726, M&E within organizational structure 0.881. Therefore, the instrument for measuring monitoring and evaluation practices and project performance was considered reliable and valid for actual data collection. The regression findings, with significant coefficients (M&E human capacity building: B = 0.815, p = 0.027; Organizational Structure: B = 0.648, p = 0.003 underscore the substantial influence of M&E human capacity building, organizational structure on the performance of water projects in Isiolo County, Kenya, suggesting that investments in enhancing these areas can significantly improve project outcomes. Therefore, recommendations include prioritizing capacity-building initiatives, implementing clear organizational structures, to optimize project performance and ensure sustainability.

Key Words: Monitoring and Evaluation Practices, M&E Human Capacity Building, M&E within Organizational Structure, Water Projects, Isiolo County


Full Text:

PDF

References


Akira, J. & Fridah, S.(2017). Factors affecting projects performance of Kenya port Authority. International journal of managing studies and research, 5(3) 20-33

Bonareri, J. O. & Kisimbii, J. (2020). Determinants of performance of monitoring and evaluation systems for county government projects: A case of Makueni County. International Academic Journal of Information Sciences and Project Management, 3(6), 162-180

Bungoma County, Kenya. PHD Thesis

Callistus, T. &, Clinton, A. (2018). The Role of Monitoring and Evaluation in Construction Project Management. In: Karwowski, W., Ahram, T. (eds) Intelligent Human Systems Integration. IHSI 2018. Advances in Intelligent Systems and Computing, 722(1).

Castro, M. S., Bahli, B., Barcaui, A., & Figueiredo, R. (2020). Does one project success measure fit all? An empirical investigation of Brazilian projects

Christensen, O., & Hasannasab, M. (2021). A survey on frame representations via dynamical sampling. arXiv preprint arXiv:2201.00038.

Culture, Leadership and Performance of Educational Building Infrastructural Projects in

Dahlan, M. K. M., Abdullah, N., & Suhaimi, A. I. H. (2021). The Propose Organization Structure for Digital Workplace. Paper presented at the 2021 IEEE Symposium on Computers & Informatics (ISCI).

Gamba P. (2016). Factors affecting the utilization of monitoring and evaluation Findings in Implementation of Malaria Control Programmes in Mukono District, Uganda, Masters Dissertation, Uganda Technology and Management University

Görgens, M., & Kusek, J. Z. (2019). Making Monitoring and Evaluation Systems Work : A capacity Development Toolkit. Worls Bank https://openknowledge.worldbank.org/handle/10986/2702 License: CC BY 3.0 IGO

governmental organizations projects in Kiambu county. International Journal of

Hayat, K., Hafeez, M. & Bilal, K. (2022). Interactive Effects of Organizational Structure and Team Work Quality on Project Success in Project Based Non Profit Organizations. iRASD Journal of Management, 4(1)68-87

Hussein, I. & Minja, D. (2019). Influence of Devolution Monitoring and Evaluation on Service Delivery in Isiolo County Government. International Journal of Current Aspects. 3(2). 305-318.

Karanja, J. W., & Yusuf, M. (2018). Role of monitoring and evaluation on performance of non-

Leiter, T. (2021). Do governments track the implementation of national climate change adaptation plans? An evidence-based global stocktake of monitoring and evaluation systems. Environmental Science and Policy, 1(125) 179-188

Micah, N. J., & Luketero, S. W. (2017). Monitoring and Evaluation Systems and Performance of

Molapo, W. L. (2019). An Assessment of the Components of an Effective Monitoring and Evaluation System in Local NGOs: A Case Study of Earthchild Project. Unpublished Master’s thesis, Stellenbosch University, South Africa.

Munene, H. W. & Kinoti, K. (2020). Monitoring and evaluation approaches and performance of galana kulalu maize irrigation project, Kenya. International Academic Journal of Information Sciences and Project Management, 3(6), 293-311

Mutekhele B. N. (2018). Utilization of Monitoring and Evaluation Systems, Organizational

Mutsune, O. & Ngugi, L. (2023). Influence of Monitoring And Evaluation Planning On Project Implementation By National Lands Commission In Nairobi City County, Kenya. International Journal of Social Science and Humanities Research, 11(2) 387-393

Natalia, M., Natalya, B., Andrii, K., Borys, M., Nataliia, B. & Iryna, M. (2019). Models and organisational characteristics of preschool teachers’ professional training in some EU countries and Ukraine., 46-93

Nicholas, J. M., & Steyn, H. (2017). Project management for engineering, business and technology. Routledge.

Non-Governmental Based Maternal Health Projects in Bungoma South Sub-County, Kenya. European Scientific Journal, ESJ, 13(23), 11

Nyobange, B., Ogolla, P., & Kitheka, S. (2019). Factors influencing performance of solid waste management projects at Kenya Ports Authority. The Strategic Journal of Business & Change Management, 6(4), 50-62.

Ochieng, V. (2016). Influence of organizational structures on project performance: A case of Taylor Nelson Sofres Nairobi, Kenya. Unpublished Masters theses, University of Nairobi

Ouma, O. E. (2015). Influence of Monitoring and Evaluation Tools on Program Performance of Selected Non-Governmental Organizations in Nairobi County, Kenya (Doctoral dissertation, Master’s Thesis).

Paru, B. (2020). The role of monitoring and evaluation system in promoting performance of Non-Governmental Organizations in Juba County, South Sudan. Unpublished Masters’ Thesis. Mount Kenya University

Prasad, L. (2020). Principles and practice of management: Sultan Chand & Sons

Rahmawati, Y., & Suwaji, S. (2022). English Capacity Building in Preparing Competent Logistics Sector’s Staff in Indonesia. Journal of English Education and Teaching, 6(2), 171-187.

.

Tong, I. (2019). Effects of Monitoring and Evaluation Process on the Performance of County Government Projects Kisii County, Kenya. International Journals of Academics & Research, 1(2)81-93

Vallejo, L. (2017). "Insights from national adaptation monitoring and evaluation systems", OECD/IEA Climate Change Expert Group Papers, No. 2017/03, OECD Publishing, Pari

Vodneva, S., Donina, I., & Dagaeva, I. (2021). Formation of Management Teams of Educational Organizations. Paper presented at the International Scientific and Practical Conference “Russia 2020-a new reality: economy and society”(ISPCR 2020)

Wephukhulu J. (2017). Factors influencing utilization of monitoring and evaluation results in county governments: a case of Busia county Kenya. Unpublished Masters’ Thesis, University of Nairobi

Yao, X., Li, J., Zhu, Y., Li, L., & Zhang, W. (2020). Designed synthesis of three-dimensional callistemon-like networks structural multifunctional electrocatalyst: Graphitic-carbon-encapsulated Co nanoparticles/N-doped carbon nanotubes@ carbon nanofibers for Zn-air batteries application. 193, 108058


Refbacks

  • There are currently no refbacks.